Users can configure validation on a Date Parameter by setting up validation criteria and conditions.
1. Log in to the system.
2. Ensure there is an existing prototype with a Date Parameter.
3. Navigate to the prototype.
4. Navigate to the task.
5. Select the date parameter that requires validation.
6. Navigate to the validations section.
7. Click 'Add' to begin setting up a new validation.
8. Configure the validation by performing the following steps:
- Select a criterion from the options (<, >, ≤, ≥, =, ≠).
- Select the value type as either 'Constant' or 'Parameter'.
9. Enter an error message that will display if the validation criteria are not met.
10. Click 'Save' to save the validation settings.